A Study on Labour Productivity in Coimbatore Zone Construction Industry
DOI:
https://doi.org/10.51983/tarce-2018.7.1.2250Keywords:
Labour Productivity, Coimbatore Zone, Performance, Construction IndustryAbstract
Construction industry faces lots of challenges with regard to problems associated with productivity. Productivity is one of the most important factors affecting the overall performance of any organization, whether large or small and the problems are usually associated with performance of labour. The performance of labour is affected by many factors and is usually linked to the performance of time, cost, and quality. While there are several input resources in a transformation process, labour productivity plays a particular role. A deeper comprehension of the factors influencing labour productivity can enable managers to more effectively allocate limited resources, provide workers with better support, or increase workers’ motivation.
References
A. A. Attar, A. K. Gupta and D. B. Desai, “A Study of Various Factors Affecting Labour Productivity and Methods to Improve It”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), ISSN: 2278-1684, pp. 11-14.
I. Fagbenle Olabosipo, O. Ogunde Ayodeji and D. Owolabi James, “Factors Affecting the Performance of Labour in Nigerian Construction Sites”, ISSN 2039 – 2117, Mediterranean Journal of Social Sciences MCSER, Vol. 2, No. 2, pp. 251-257, May 2011.
P. Ganesh Prabhu and D. Ambika, “Study on Behaviour of Workers in Construction Industry to Improve Production Efficiency”, International Journal of Civil, Structural, Environmental and Infrastructure Engineering Research and Development (IJCSEIERD), ISSN 2249-6866,Vol. 3, No. 1, pp. 59-660, March 2013.
S. S. Janagan and K. Thirumalairaja, “Comparative Study of Local and Migrant Labours for Productivity Enhancement in Construction Field”, International Journal of Innovative Research in Science, Engineering and Technology, pp. 26-35, Feb. 2014.
Jelle van Lottuma and Jan Luiten van Zanden, “Labour Productivity and Human Capital in the European Maritime Sector of the Eighteenth Century”, Explorations in Economic History, Vol. 53, pp. 83-100, 2014.
Mostafa E. Shehata and Khaled M. El, “Gohary – Towards Improving Construction Labour Productivity and Projects’ Performance”, Alexandria Engineering Journal, Vol. 50, pp. 321-330, 2011.
Paul Chan, “Factors Affecting Labour Productivity in the Construction Industry”, Department of Building Engineering and Surveying, Heriot-Watt University, Edinburgh, EH14 4AS, UK, pp. 771-780.
Rateb J. Sweis, Ghaleb J. Sweis, Ayman A. Abu Hammad and Malek Abu Rumman, “Modeling the Variability of Labour Productivity in Masonry Construction”, Jordan Journal of Civil Engineering, Vol. 3, No. 3, pp. 197-212, 2009.
Serdar Durdyev, Syuhaida Ismail and Nooh Abu Bakar, “Construction Productivity in Turkmenistan: Survey of the Constraining Factors”, International Journal of e-Education, e-Business, e-Management and e-Learning, Vol. 3, No. 1, pp. 18-23, Feb. 2013.
A. Soekiman, K. S. Pribad, B. W. Soemard and R. D. Wirahadikusumah, “Factors Relating to Labour Productivity Affecting the Project Schedule Performance in Indonesia”, Procedia Engineering, Vol. 14, pp. 865–873, 2011.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2018 The Research Publication
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.