Investigating Cost Overrun Factors in High-Rise Housing Projects in India

Authors

  • Saket Patni PG Student, Department of Architecture, School of Planning and Architecture, Vijayawada, Andhra Pradesh, India
  • Venkata Krishna Kumar Sadhu Associate Professor, Department of Architecture, School of Planning and Architecture, Vijayawada, Andhra Pradesh, India

DOI:

https://doi.org/10.51983/tarce-2023.12.1.3666

Keywords:

Cost Control, Cost Overrun Factors, Head Contractors, High-Rise Housing Projects

Abstract

Cost overruns in building projects are typical in India. This might occur owing to a variety of factors. The aim of the study was to identify the factors impacting high-rise housing project costs in India, that are likely regulatable by head contractors. A questionnaire survey was used to perform this study with a group of related professionals from firms in the private as well as public sectors, having experience in high-rise housing projects. The frequency and impact of each factor were assessed based on the perspectives of the participants. The factors were then rated in order of the increasing Index of Relative Importance. The study identified significant factors that are likely to be regulated by head contractors, namely, productivity of labor, the performance of suppliers and sub-contractors, productivity of equipment, poor management of the site, scheduling, controlling and monitoring, inexperienced project managers, ineffective procurement planning of materials, ineffective procurement of equipment, delivery of materials (shortage or delay) and shortage of skilled labor.

References

S. L. Chan and M. Park, “Project cost estimation using principal component regression,” Construction Management and Economics, Vol. 23, No. 3, pp. 295-304, 2005.

D. Van Der Westhuizen and E. P. Fitzgerald, “Defining and measuring project success,” European Conference on IS Management, Leadership and Governance, Reading, United Kingdom, 7-8 July 2005.

Z. S. M. Khaled, Q. J. Frayyeh, and G. K. Aswed, “Forecasting the final cost of Iraqi public school projects using regression analysis,” Engineering and Technology Journal, Vol. 33, No. 2, pp. 477-486, 2015.

H. M. Morsy, “Cost control techniques and factors leading to cost overruns in construction projects,” Diploma Thesis, Faculty of Engineering, Cairo University, Giza, Egypt, 2014.

G. H. Ali, “Factors affecting the cost of building school buildings in Karbala,” Quarterly Refereed Journal for Natural and Engineering Science, Vol. 3, A, No. 5 and 6, pp. 63-86, 2016.

T. Ramachandra and J. O. B. Rotimi, “Causes of payment problems in the New Zealand construction industry,” Journal of Construction Economics and Building, Vol. 15, No. 1, pp. 43-55, 2015.

M. Gunduz, Y. Nielsen and M. Ozdemir, “Fuzzy assessment model to estimate the probability of delay in Turkish construction projects,” Journal of Management in Engineering, Vol. 31, No. 4, pp. 1-14, 2011.

Y. A. Olawale and M. Sun, “Cost and time control of construction projects: inhibiting factors and mitigating measures in practice,” Construction Management and Economics, Vol. 28, No. 5, pp. 509-526, 2010.

L. Ali, R. A. Ali, and Z. Khaled, “Investigation of Cost-Influencing Factors Potentially Controllable by Main Contractors in Construction Projects in Iraq,” Engineering and Technology Journal, Vol. 38, Part A (2020), No. 07, pp. 1069-1076, 2020.

D. Jadhav, B. A. Konnur and S. Patil, “Analysis of Factors Causing Cost Overruns in Residential Building Construction Projects,” International Journal of Research in Engineering, Science and Management, Vol. 3, No. 7, July-2020, 2020.

M. M. U. R. Bhat, “Factors Influencing Time and Cost Overruns in Indian Construction Projects,” International Research Journal of Engineering and Technology (IRJET), Vol. 06, No. 03, Mar 2019.

A. C. Devi and K. Ananthanarayanan, “Factors influencing cost over-run in Indian construction projects,” MATEC Web of Conferences, Vol. 120, No. 02023, 2017.

S. P. Wanjari and G. Dobariya, “Identifying factors causing cost overrun of the construction projects in India,” Sadhana, Vol. 41, No. 6, pp. 679-693, June 2016.

U. S. Vaardini, S. Karthiyayini and P. Ezhilmathi, “Study on Cost Overruns in Construction Projects - A Review,” International Journal of Applied Engineering Research, Vol. 11 No. 3, 2016.

Y. K. Patil and P. P. Bhangale, “Investigation of Factors Influencing Cost Overrun in High-Rise Building Constructions,” International Journal of Latest Trends in Engineering and Technology (IJLTET), Vol. 6, No. 3, January 2016.

Downloads

Published

12-06-2023

How to Cite

Patni, S., & Sadhu, V. K. K. (2023). Investigating Cost Overrun Factors in High-Rise Housing Projects in India. The Asian Review of Civil Engineering, 12(1), 29–33. https://doi.org/10.51983/tarce-2023.12.1.3666