Risk Assessment for Fast Tracked Commercial Interior Fit-Out IT/ITES Projects in India
DOI:
https://doi.org/10.51983/tarce-2023.12.1.3625Keywords:
Interior Fit Out Projects, IT/ITES Projects, Project Management, Risk Assessment, Risk ManagementAbstract
This paper is about risk management in fast-track commercial interior fit out projects. The aim of the study is to identify risk in interior fit out projects such as in offices of IT/ITES, also to understand how to manage those risk and to propose a framework to mitigate risk in interior fit out projects. An effort has been made to study and identify the factors which includes overall risks and delivery risk in an interior fit out. Various Strategy such as delay management, Resource Management and technological choice has also been taken into consideration. Factors based on available literatures were taken and a questionnaire survey was floated having total 25 questions and factors are selected based on ranking based on Relative importance index.
References
P. Ballesteros-Pérez, “Modelling the boundaries of project fast-tracking,” Automation in Construction, Vol. 84, pp. 231-241, 2017. DOI: https://doi.org/10.1016/j.autcon.2017.09.006.
P. Ballesteros-Pérez, K. M. Elamrousy and M. C. González-Cruz, “Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking,” Automation in Construction, Vol. 97, pp. 229-240, 2019. DOI: https://doi.org/10.1016/j.autcon.2018.11.001.
R. Dehghan and J. Y. Ruwnapura, “Model of Trade-Off between Overlapping and Rework of Design Activities,” Journal of Construction Engineering and Management, Vol. 140, No. 2, 2014. DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000786.
K. M. Elamrousy and P. Ballesteros-Pérez, “On modeling activity crashing and overlapping: A first algorithm,” Proceedings of International Structural Engineering and Construction, Vol. 5, No. 1, 2018. DOI: https://doi.org/10.14455/ISEC.res.2018.42.
C. Garrido Martins, S. M. Bogus and G. Martins, “Risk Assessment in Fast-Track Construction Projects: A conceptual model Assessment of Project Risks in Fast-Track Construction Projects View project Strategies for Prioritizing Needs for Accelerated Construction after Hazard Events View project CON175-1 Leadership in Sustainable Infrastructure Risk Assessment in Fast-Track Construction Projects: A Conceptual Model,” 2017. [Online]. Available: https://www.research gate.net/publication/319493188.
A. P. Ghom, “Fast Track Construction Technique-With Special Reference to Formwork System for High Rise Structure,” Journal of Civil Engineering and Environmental Technology, Vol. 3, No. 7, [Online]. Available: http://www.krishisanskriti.org/Publication.html.
Zinab Abuwarda, by, Hegazy, T., Professor, A., Civ Eng, C. J., & Abuwarda, Z. (n.d.). Multi-Dimensional Optimization Model for Schedule Fast-Tracking without Over-Stressing Construction Workers. [Online]. Available: www.nrcresearchpress.com.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 The Research Publication
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.